Phone Manufacturing

Project requirements

· Aluminium of alloys

· The phone case often consists of lightweight materials

• Cobalt oxide in lithium

· • Graphite made of carbon

· Gold

· Copper

· Silver

Metal oxides, carbon-based compounds, and numerous other elements are among them. In order to create a mobile phone from its component parts and materials, raw materials must be extracted from the ground and processed. Aluminum alloys are often used to construct a smartphone's housing because of their low weight and high strength. A combination of lithium cobalt oxide and carbon graphite is used in the manufacturing process of the batteries. There is a possibility that the wiring of the phone contains gold, copper, and silver.

Budget Plan

Phone Manufacturing Transaction Risk Plan

Expected Risk

Some Reason

Response to Risk

Protection for the Issue

Security hazards

Terrorism

By putting in place the necessary checks and balances for monitoring

Provide Security Measures

Operational

A failure to properly execute core processes and vital tasks, such as production or procurement.

Requesting feedback from each member of the team or staff

Having conversations with prominent members of the industry or critical stakeholders

Health and safety

Compromise the compliance norms of an organization.

Safety and health policies should be evaluated and monitored frequently to identify risks that could cost a company money in fines or other penalties.

The onus of permanently monitoring health and safety risks in the workplace and in the company's products and services

Performance

It is quite unlikely that the outcomes will be as desired.

Using KPIs in risk management

Create a strategy for reducing risks to protect yourself from potential hazards.

Change Management Process

The client is required to submit their permission on the design of the modification before the site engineer can send the drawing to the person in charge of the project. If there is going to be any sort of change made to the project, the customer must provide their approval on the design first. After having a conversation about the project with the owner and the project manager, the total cost of any adjustments that need to be made to the project will be added to the list of entity items. This will take place after the discussion. Each and every item list will be presented to the customer for their review and authorization prior to being sent on to the project manager for the purpose of receiving final confirmation. After receiving consent from the client, the Site engineer will make any necessary modifications to the system.

Stakeholder engagement and communication plan

Phone Manufacturing Team Manager

Services

Site Operating System Engineer

Design Prototype Engineer

A Systems Engineer's primary responsibility is to analyse a system and locate any problems that may exist inside it. When issues develop, they give solutions, which may include the designing of systems, the updating of hardware, or normal maintenance.

Earned Value Analysis Report

Founded By

Date

Duration

References

Jin, J., & Von Zedtwitz, M. (2008). Technological capability development in China's mobile phone industry.  Technovation28(6), 327-334.

Page, T. (2015). AN APPROACH TO THE MANAGEMENT OF THE SUSTAINABLE ISSUES IN MOBILE PHONE DESIGN AND MANUFACTURING.  Journal on Management10(2).

Costs

Project managerDesign EngineerDrafts manSite Engineer310.51

Planned Value (PV)12345678910111210001800440075001140013900146001550017000177001910019900Earned Value (EV)123456789101112906002660404063001348515565Actual Cost (AC)123456789101112800195045506550108001360014500