Chat with us, powered by LiveChat Discussion - STUDENT SOLUTION USA

 Initial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.

Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion

.Also, provide a graduate-level response to each of the following questions:

  1.  In addition to cost, what factors should be considered in selecting a building contractor? What can go wrong if the lowest bid is selected and nothing else is considered? 
  2. What is the difference between an RFP and an RFQ? Give two specific examples where an RFQ could be used and two specific examples where it is more likely that the organization will go with an RFP. (Use examples NOT from your textbook.)

[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!]

 [Your initial post should be at least 100+ words and in APA format (including Times New Roman with font size 12 and double spaced). 

Book:   

Watt, A. (2019). Project Management, 2nd Edition. BCcampus Open Education. Retrieved from

error: Content is protected !!