all related requirements and guidelines are in the files
1.Planning and preparing various activity statistical reports, analyzing periodic key performance indicators, and engaging in operational performance review related to in-the filed security personnel.
2. Conducting analytical ranking process of qualified nominates for engaging in job related courses in-Kingdome and out of Kingdome, operational supervisory coverages level, and critical areas personnel assignments.
3. participation in performing weekly operational excellence and field compliance report to division heads level in accordance with work directions as well as specific performance standards and policies.
4.Corddiniting and allocating of available and oncoming human and metalized resources based on various operational functional areas requirements.
5. Frequent correspondence in facilitating local events requests, handling security related routine inquires, and communicating basic information to effected parties as required.
Successful candidate is expected to perform the following duties and responsibilities:
1. Functional HR Support: Supports the key processes in their assigned area performing such duties as the distribution, follow-up, and the
close-out of documents, forms, and applications for personnel actions. Processes personnel actions through the SAP system.
2. Records Management: Maintains and updates all confidential personnel records within their functional area of responsibility. Ensures the
accuracy and completeness of all documents, forms, and requests submitted.
Reviews historical data of Storehouse materials issues, allocations and materials returns and makes analysis of data for use in
recommending inventory levels.
In addition, performs a wide variety of clerical and administrative duties.
Prepares various statistical reports, data preparation and summaries using financial, planning and programs, statistical or other
reference data as source material.
perform analytical ranking of qualified nominates for engaging in job related courses in-Kingdome and out of Kingdome , supervisory coverages level, and critical areas assignments.
Handles routine inquires, replies to verbal and written requests for information over the phone, through Email, CRM and
IVR systems. Communicates basic information to effected parties as required
Saudi Aramco: Company General Use
|
Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University |
|
المملكة العربية السعودية وزارة التعليم الجامعة السعودية الإلكترونية |
PERIODIC REPORT
Internship Student Report | Month ……
Start Date: 12/09/2021 End Date:09/10/2021
|
Student’s Name: Abdulaziz saad alghamdi |
Student’s ID Number: 140022344 |
|
Training Organization: Saudi Aramco |
Trainee Department: DH Industrial Security Department |
|
Trainee Supervisor Name: Sattam almutairi |
Faculty Member: Dr.Faisal Alhathal |
|
Course: MGT430-Internship |
CRN: 14025 |
|
Academic Year/Semester: First term 2021-2022 |
INSTRUCTIONS
· This report must be submitted on Blackboard (WORD format Only) via the allocated folder.
· Email submission will not be accepted.
· Your work should be clearly and completely presented; marks may be reduced for poor presentation. This includes filling your information on the cover page.
· Assignment will be evaluated through BB Safe Assign tool.
· Late submission will result in ZERO marks being awarded.
· This work should be your own, copying from students or other resources will result in ZERO marks.
· Use Times New Roman font 12 for all your answers.
(Report Components)
|
Task(s) |
What are the activities and tasks given to you during this month? |
|
1. I was able to assist an a security relation representative to work on presentation file requested from the department’s manager to identify and discuss the customers’ feedback and complaints regarding the recent digitalized implanted visitors management system. 2. Every month, several meeting requests come to the department’s division head (he administrates around 290 personnel) from infield security personnel, as they intend to discuss their willingness to transfer to remote area for monetary reason, workplace relocation, annual performance appraisal and promotion entitlement, and etc; therefore I participated in analyzing and evaluating the requests based on eligibility and priorities |
|
|
New skill(s) |
What skills did you learn through the month? |
|
1. The first skill I learned was the managerial communication protocol,and how to fulfil the chain of command structure vertically and horizontally. 2. All job-related requests and transactions are systematic and planned to meet the standard criteria and proper basic functions. 3. 3. The professional work environment is holding each delegate accountability and empowerment via direct and indirect supervisions. |
|
|
Meeting(s) |
How many meetings did you attend? I attended 2 meetings as follows: 1. Monthly engagement and progress meeting. 2. Case management and spreading mechanism meeting. |
|
Difficulty/ Challenge(s) |
What are the difficulties you had this month? |
|
As it had been my first month on COOP, I experienced some difficulties in understanding the abbreviations and communication codes. They are typically common and well familiar by all the company’s employees ( called Aramcons’ language!) |
|
|
How did you overcome these difficulties? |
|
|
I overcame most of the communication difficulties through participation and engaging in daily activities and coworkers assistance and elaboration. |
|
|
Learning |
What did you learn from completing the tasks |
|
I had the chance to explore and gain crucial teamwork roles and responsibilities, and real-life problems through working together to achieve a wide range of basic and advanced objectives. |
|
|
What did you want to learn more? |
|
|
I am hoping to be a participant of the next monthly communication meeting that discuss the periodic Key Performance Indicator (KPIs) and weekly activities and accomplishments bulletin. I am hoping to take the advantages of the COOP to develop skills and capabilities for future career path. |
*Note:
1. This report is a summary of the training activities performed.
You may attach additional pages if needed. And student can attach any extra note to this form.
College of Administration and Finance Sciences
Form No 4- Internship Report Cover Page
|
Student`s name: |
|
|
Student`s ID #: |
|
Training Organization: |
Trainee Department: |
|
Field Instructor Name: |
Field Instructor Signature: |
|
Course Title: |
CRN: |
|
Internship Start Date: |
Internship End Date: |
|
Academic Year/Semester: |
For Instructor’s Use only
|
Instructor’s Name: |
Total Training Hours /280 |
|
Students’ Grade: Marks Obtained /30 |
Level of Marks: High/Middle/Low |
Academic Report Guideline(Co-op)
(please do not include this text in the final report, just follow its guidelines and use the cover page above)
The report should be submitted within two weeks after you finish your Co-op training Program.
In addition, the report should be approximately 3000 – 4000, single –spaced and consider taking the following format
General instructions for writing the final report:
The report must be written in English language.
The word limit is 3000-4000.
If the report word count is not within the required word limit, marks will be deducted.
The font size is 12, Times New Roman, justified, 1.5 space.
Main headings use font size of 16 and bold.
Add page numbers in the middle bottom of the page.
Plagiarism or copying from other sources will result in ZERO marks.
This report must be submitted on Blackboard (WORD format only) via the allocated folder.
Your work should be clearly and completely presented; marks may be reduced for poor presentation. This includes filling your information on the cover page.
Assignment will be evaluated through BB Safe Assign tool. Late submission will result in ZERO marks being awarded.
First Page
The first page should display the student’s full name, internship start and finish dates, working hours per week, company/institution name, and the cover page.
The field instructor should sign on the first page.
A Brief Executive Summary of the Internship
A one-page summary of the company/institution and a short account of the major activities carried out during the internship period.
To allow the student to express her/his thankful and gratitude to individuals (such as: field instructor, academic supervisor, colleagues…etc.) who help them in carrying out and completing her/his training journey. This part will aid the students to learn basic elements of academic writing. To express their appreciation in a concise and professional manner.
Table of Contents
Contents of the report with page numbers, list of tables, and list of figures.
Introduction
A brief of the report. The Aim of the report.
Chapter 1: Description of the company
This section should answer the following questions:
What is the full title of the company/institution?
Give a brief history of the company, full mailing address and relevant weblinks
What is the type of ownership of the company/institution?
State the main shareholders and their shares.
What is the sector that the company/institution operates in?
Specify the products and services produced and offered to its customers/clients.
Who are regarded as the customers/clients of your internship company (consider the end users, retailers, other manufacturers, employees,etc.)?
Provide an organization chart of the company, along with information on the number of employees. Provide a list of functions performed by different departments/divisions in the internship organization. Provide an overview off the production system or service procedure (what are the resources, inputs, outcomes, andconstraints?)
Provide a process chart of a major product and/or service.
The following questions can be classified as your major fit (Finance, Accounting, Ecommerce and Management).
What kind accounting/finance/IT//quality/marketing standards and principles are used in the organization?
Discuss telecommunication technologies (Database, Instant Messenger, Networking, Ecommerce tools) used in the company.
Describe the quality planning and control activities in the internship organization.
Describe the quality control activities throughout the life cycle of the product/service groups
What kind of financial analysis and decision-making methods are used by corporate treasurers and financial managers in the internship organization?
What types of marketing, selling, and human resources analysis are performed (cost system, evaluation of consumers, needs, product strategy, distribution strategy, promotional strategy)?
Chapter 2: Internship activities
This is the main body of your report. During the internship period, the focus of the training may on the following types of analysis and questions. You do not have to answer all the questions in the list: Describe your working conditions and functions, such as: Who is your supervisor (include his/her name and his/her position); other team members or co-workers and what their functions are to complement yours.
Provide a detailed description about the department(s) that the trainee did her/his training with them. Adding all sub-divisions for this department(s) if it is available. Student can add to this description a supported chart.
Detailed descriptions about all tasks and activities that the trainee did them during her/his training period.
Gained skills and how they added value to your work
Other tasks that are not related to the trainee’s major that done by her/him at the company should be included in this chapter as well.
What types of incentives did you get as a trainee to be more proactive and productive?
Describe what kind of working documents and analysis you did there and what experiences you have gained throughout yourtraining. Provide examples of your work.
A comparison between theory (things you have learned in the classroom) and practice (things you did or observed at the company) must be made and highlighted. In this section the student can add a supported table includes which academic course (s) (course title and code) helped to perform training tasks. For example, two columns; the first one shows the course name and second column shows the tasks performed and related to this course.
Show some work samples that you have encountered/conducted at the company through graphs, pictures, data, drawings, or design calculations and include them in your report.
Lessons learnt (what the overall benefits gained from the training program)
Chapter 3: Recommendations
Advantageous that helped the student in completing the training program.
Disadvantageous and challenges that faced the student and how he/she did overcome them.
Recommendations to improve training program in the college.
Recommendation for the training company. Conclusion Sum up and summary of the training experience. Reference If it is needed Appendix (option) This will help the instructor to have a background about the trainee and his/her previous experiences. Also, it helps the students in writing their CVs for future job application especially for fresh graduates who do not have previous practical experiences.
Basic information (name, city, contact details…etc.).
Job objectives.
Academic qualifications.
Practical experiences.
Skills this will help the instructor to have a background about the trainee and his/her previous experiences
College of Administration and Finance Sciences
Form No 4- Internship Report Cover Page
|
Student`s name: |
Abdulaziz Saad Alghamdi |
|
Student`s ID #: |
140022344 |
|
Training Organization: Saudi Aramco |
Trainee Department: DH industrial security department |
|
Field Instructor Name: Rami AlZahrani |
Field Instructor Signature: |
|
Course Title: MGT-430: Internship |
CRN: 14025 |
|
Internship Start Date: 12/09/2021 |
Internship End Date: 09/12/2021 |
|
Academic Year/Semester: First term 2021-2022 |
For Instructor’s Use only
|
Instructor’s Name: |
Total Training Hours /280 |
|
Students’ Grade: Marks Obtained /30 |
Level of Marks: High/Middle/Low |
Executive summary
This report is based on my internship program at Saudi Aramco Company (DH Industrial security Department) for the bachelor’s degree in Saudi Electronic University, College of Administrative and Financial Sciences for First term 2021-2022.
The DH industrial security operation department consists of a business line manger whom administrates 4 different operational areas (Dhahran, Qatif, SA Dammam Airport, and Shaybah Project) where the headquarter office of the department located in Dhahran area with essentials supportive services units (Admin unite, special service unit, and Quality assurance and Compliance review unit).
The General Manager in Saudi Aramco of the Industrial Security department administrates four managerial kingdom wide areas ( Dhahran, Western region (Jeddah, Yanbu, Jazan), Northern region(Ras tanura, and Arabian gulf on-shore and off-shore facilities), Southern Region (Abqaiq, AlAhsa, and Arabian gulf on-shore and off-shore facilities(. As well as the industrial security support department (Engineering and planning division, Technological operations and enhancements, Training division, and Executive controlling division).
The Vision and mission of Saudi Aramco industrial security operation departments are as follows:
Vision:
|
Sustain protection of Saudi Aramco personnel, assets, and property as directed by Saudi Aramco Industrial Security Management and the Saudi Arabian Government. Mission:
|
The purpose and scope of the unit is corresponding of safety and security services, handling concerns and conflicts cases to SADH area facilities as well as administrating, coordinating and directing the operational activities in compliance with the corporate, department and government directives.
I was able to carry out several activities during my internship program including data analytic of evaluating, selecting and comparing various information in order to conduct appropriate and related business functions. Also,
Tracking, assessing, and responding towards the overall performance and KPI outcomes of the department in compliance with the corporate HR policies and rules , IT Usage Behavior, and internal work rules.
Acknowledgment
My journey was enriched with positive support and collaboration whether from the university institution or organization. I would like to express the past three months of my experience in a context of “professional career journey” whether from working with my kind and collaborative Dr. Faisal Al-hathal or my field supervisors over the time whom were supportive and patient with my needs, curiosity and enthusiasm. I toke part in a great team-working environment that led into gaining and generating a professional and appropriate administrative knowledge, skills and behaviors. Exploring a distinct business model and standards within in a line with college academic knowledge and guidelines. Such an adequate integration resulted in finding what is really matter in real-work life in the future with the great assistance and monitoring of supervisor, college supervisor and the classroom courses. Complement and gratitude are legitimate to every collages whom guided and pushed me to reach this level of enthusiasm and knowledge.
Table of contents
Report cover-page ………………………………………………………………………………………… 1
Executive Summary……………………………………………………………………………………….. 2
Acknowledgment ………………………………………………………………………………………….3
Saudi Enaya Organizational Structure……………………………………………………………………………. 6
Internship Activities ………………………………………………………………………………………………………. 7
Organization Layout & responsibilities………………………………………………………………….. 8
Product and services flow …………………………………………………………………………………… 9, 10, 11
Saudi ENAYA Departments ……………………………………………………………………………………… 12, 13
Quality & Control ………………………………………………………………………………………………….. 14, 15
Comparison Theory ……………………………………………………………………………………………………… 16
Assessment of Internship …………………………………………………………………………………………….. 17
Conclusion …………………………………………………………………………………………………………………… 18
Appendix ………………………………………………………………………………………………….. 19, 20,21,22,23
3
|
Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University |
|
المملكة العربية السعودية وزارة التعليم الجامعة السعودية الإلكترونية |
Internship Student Report | Month October – September
Start Date:10/10/2021 End Date:19/11/2021
|
Student’s Name: Abdulaziz saad alghamdi |
Student’s ID Number: 140022344 |
|
Training Organization: Saudi Aramco |
Trainee Department: DH Industrial Security Department |
|
Trainee Supervisor Name: Sattam almutairi |
Faculty Member: Dr.Faisal Alhathal |
|
Course: MGT430-Internship |
CRN: 14025 |
|
Academic Year/Semester: First term 2021-2022 |
INSTRUCTIONS
· This report must be submitted on Blackboard (WORD format Only) via the allocated folder.
· Email submission will not be accepted.
· Your work should be clearly and completely presented; marks may be reduced for poor presentation. This includes filling your information on the cover page.
· Assignment will be evaluated through BB Safe Assign tool.
· Late submission will result in ZERO marks being awarded.
· This work should be your own, copying from students or other resources will result in ZERO marks.
· Use Times New Roman font 12 for all your answers.
(Report Components)
|
Task(s) |
What are the activities and tasks given to you during this month? |
|
1. I gained limited system access for performing specific authorized tasks and duties such as reviewing and evaluating the SAP role requests of the operational personnel as well as processing and dispatching workflow items on CRM. 2. I participated in the statistical analysis of revising the tasks, rolls and responsibilities applied by operational personnel after the refining of the job titles and position of the department key personnel. 3. I was introduced to the framework of the five corporate values ( Accountability, Integrity, Excellence, Safety, and Citizenship) in which all are fundamental’s guiding pillars in the execution of each and every job-related transactions. |
|
|
New skill(s) |
What skills did you learn through the month? |
|
1. I observed the proper techniques of conducting the teamwork skills in order to meet the administrative functions. 2. I had the opportunity to review and comprehend the standard operating procedures for administrative guidelines directive. |
|
|
Meeting(s) |
How many meetings did you attend? |
|
I attended two meetings as follows: 1. SOPS quarterly revision meeting. 2. Case Management progress meeting. |
|
|
Difficulty/ Challenge(s) |
What are the difficulties you had this month? |
|
I experienced a few difficulties in handling with the most highly sophisticated corporate system. Accessing the customized SAP logical platforms ( PRH, PRC, PRA and etc.) Each platform accommodate distinguished transactions and role assignments. |
|
|
How did you overcome these difficulties? |
|
|
I worked with my direct supervisor to overcome the difficulties by providing the adequate transaction codes and necessary methods in integrating the workflow of each item in the SAP inbox. |
|
|
Learning |
What did you learn from completing the tasks |
|
1. I was able to discover the overall system design and standard layout so to be familiarized and oriented to fulfill the ultimate job related functions and exceptions. 2. I had the privilege to access the corporate system platforms and gained an overall orientation of how to integrate various system functionality to fulfill the assigned tasks and requirements |
|
|
What did you want to learn more? |
|
|
In the next few weeks, I am planning on extending my experience by introducing myself to more system communication facilities and resources, engaging in more day-to-day roles and functionalities. |
*Note:
1. This report is a summary of the training activities performed.
You may attach additional pages if needed. And student can attach any extra note to this form.
1
Student Name: Amal Qasim Mohammed Ahmed
Internship start: 13 Jan 2019
Internship Finished: 21 Mar 2019
Working hours: 8 hours per day 40 hours per week
Company name: Saudi Enaya for health insurance
2
Table of contents
Executive Summary ………………………………………………………………………………………… 3
Company Description ………………………………………………………………………………………… 4
Product & Services …………………………………………………………………………………………………… 5
Saudi Enaya Organizational Structure……………………………………………………………………………. 6
Internship Activities ………………………………………………………………………………………………………. 7
Organization Layout & responsibilities………………………………………………………………….. 8
Product and services flow …………………………………………………………………………………… 9, 10, 11
Saudi ENAYA Departments ……………………………………………………………………………………… 12, 13
Quality & Control ………………………………………………………………………………………………….. 14, 15
Comparison Theory ……………………………………………………………………………………………………… 16
Assessment of Internship …………………………………………………………………………………………….. 17
Conclusion …………………………………………………………………………………………………………………… 18
Appendix ………………………………………………………………………………………………….. 19, 20,21,22,23
3
Executive Summary
Saudi Enaya is a Saudi company specialized in health insurance, offering first class product and
qualified services for groups and individuals.
It has a different scale of product which can be suitable based on the client requirements and the
demographic coverage needed.
Saudi Enaya consist of full structured organization with different departments that work together in
managing the insurance policy cycle and to keep the work going on in a smooth operational
structure
My internship was in provider network which is the department that I officially work in Saudi Enaya
as I am an employee in since Mar 2018, in that department we focus on the healthcare providers
and all related services.
most of our activities in Network department are administration work, it consist of building the
relation with healthcare providers at first in types of agreement to provide services to policy holders,
those services are in type of access to their facilities based on provided health coverage, also part of
this agreement is the payment agreement to those providers, some type agreement comes in the
form of monthly payment and some of it as the form of commercial agreement on a particular
period with an agreed percentage. And before we start the payment we had to create a type of
calculation for the amount submitted by the provider in order to get the accurate amount.
aside to the regular administration work, good relation and financial structuring we had the fraud
and abuse unit which I had assigned to work within that unit to manage with an assigned doctor, our
work in fraud unit was to identify the healthcare providers who are creating a misleading activities
and submitting falls billings that could end up to be a major loss to Saudi Enaya.
while managing the good relation with the providers we have to be sure to keep all parties in the
insurance relation linked together as without finance department, Sales , marketing & compliance
our work will not be completed as most of the job required their interference and support to
accomplish a task.
4
Company Description
Saudi Enaya for corporative health insurance known as Saudi Enaya was established in 19 February
2012, it’s a public company on the stock exchange (Tadawul), Enaya is engaged in the insurance
sector with a focus on life and health insurance.
Enaya Structure
Munich Re 15%
Al Watania for insurance 10%
Mohammed & Waleed Al Naghi 5%
Dana Khaled Juffali 2%
Mazen Fakeeh 0.038%
Faisal Tammr 0.0025%
Lee Chory 0.0025%
Khalid Al Jaffali Holding Company ( unknown percentage )
Board members
Faisal Farouk Mohammed is the Chairman of the Board of Directors
Daniel Whitehead Chief Executive Officer
Bilal Talal Al Ghazzawi Board of Directors
Dana Khaled Al Jafal Board of Directors
Mazen Soliman Faqih Board Member
Cornelius Alexander Lons is a member of the Board of Directors representing Munich Reinsurance
Johan Michael Petzer is a board member representing Al Watania Health Insurance
Contact Information
Jeddah, Saudi Arabia
Khaldiah, Prince Sultan Street, BOX 3528, Jeddah 21481
Telephone: + 966 12 5923 500
Fax: +966 12 5923 741
5
Website: www.saudienaya.com
Email: [email protected]
Product and Services
Saudi Enaya products are a range of different categories of health insurance coverage that can be suitable for
organization and individual as well as the product are compliant with the requirements of council of
cooperative health insurance. As they have a flexible options available for customers that they may wish to
have a different level of coverage depending on the employees rank or position within the company.
Saudi Enaya offer different products such as
Diamond, Gold, Silver, Bronze & Classic, each product has its own unique coverage aside to the main
requirements of CCHI which is the base to any insurance coverage add to that the unique features such as
international coverage, in patient benefits as well which include the type of room in case of admission, also
the option of increasing the dental and optical coverage.
all that within the wide network of providers across the Kingdome as Saudi Enaya Have more than 1000
Providers including Major Hospitals, Polyclinics, Diagnostic Centers, Dental Centers, Optical & Pharmacies and
not to forget the coverage in ministry of health hospitals and centers, those providers are located based on
demographics requirements of Saudi Enaya Clients, and not also to miss the CCHI minimum requirements for
each region as for each region in the kingdom we have to provider a number of hospitals and polyclinics for
our members
Those members can differs from each other as we have the factories which have normal labors and require
minimum coverage in a remote area, to a large organization with fully structure or executives to middle
managers and employees. As those clients are the members who will get the benefits out of the policy that
they will purchased for their workers.
Employment structure
Saudi Enaya has a total of 140 Employees, 42 are women’s and 98 Males with 52.9% Saudiazation
17.9% on the managerial level and 82.1% staff
Maximum services years 50% of employees will stay for 3 years
6
Saudi Enaya Organizational Structure
7
Internship Activities
My work in the provider relation network department under the supervision of Dr Mohammed Shawky as he
is the manager of the department, the network team consist of region each region are managed by a team of
two or more, I am working in the western region as the supervisor of Makkah & Jeddah our objectives in
Network team is to create a network of health care providers which they provider high standard quality
services to our members with an agreed price through a competitive agreement that can manage the cost of
medical treatments for our members. Aside to that is sustaining the relation with the providers through
meetings & calls
Recently I was assigned to fraud unit to manage the detection of abuse and fraudulent activities by providers.
Department Layout
CMO – Dr.Essam Masood
Network Manager Dr.
Mohammed Shawky
Zain Adam – Admin
Supervisor
Ahmed Salim
Northern & Southern Region
Dr. Haytham Eastern region
manager
Ahmed Al Sayed, Qasim
Sabir
Central Region Supervisors
Amal Ahmed, Mohammed
Irshad
Western Region
Samira
Admin
Razan
Admin
Amal
Admin
8
Designation Responsibilities
Network Manager /
Network Supervisor
as per the instruction
of Network Manager
Manage and facilitate the provision of requirements for reconciliation and
settlement.
Monitor efficiency & productivity of all the settlement process.
Regulate department workflow stream.
Initiate innovations to improve the process.
Follow up with claims team for timely processing of outstanding claims
Communicate with Claims / Authorization Department in case of any
discrepancy or feedback.
Cooperate with Claims and Finance to make sure the payments are
effectively released on timely manner.
Communicate with Finance to identify areas of improvement and find
solutions to enhance the process.
Demand and review the periodical reports of payments and settlements
Ensure & assess protocol adherence, as mentioned in policy and
procedures.
Document any change in related Policy & Procedures, and report them to
Network Department.
Assess department performance.
Network Admin
Supervisor / Senior
Network Officer
Train and monitor NW admin staff to fulfil the task requirements according
to operational performance indicators.
Review any issued reconciliation settlement prior signing it from the
concerned area teams
Identify issues related to provider payment and find solutions.
Follow up with the team to work according to the standard KPIs.
Ensure staff adherence to protocols.
Provide admin team feedback to Network Manager.
Supervise the Provider payment process.
Circulate regular monthly outstanding settlement report to the regional
managers to finalize the outstanding’s.
Prepare & forward outstanding Payment Reports to Network Manager.
Network
Administrator
Notifications of Summaries & Claims Reports to provider
Receive Signoff Statements / Reconciliation letters from providers
Update and forward signoff statements to claims and finance department
9
Prepare the full and final settlement letters and send to providers after
signatures from concerned area team together with sign of Network
Manager.
Keep track of all signed and stamped statements and settlement letters in a
shared excel sheet.
Notify the Claims and the Finance of any signed reconciliations in maintain
an efficient work flow process.
Follow up with Finance until the payment is finalized.
Send payment notification to the concerned providers.
Product & Services Flow
Healthcare provider Payment Settlement and Reconciliation
Each month providers sent full statements of account with the invoices of services provided to our
members, arranged by group and by date, providers also provide an excel sheet that contain invoices
details for an easy upload of those information.
Once Batch is register by Claim Department, the system identifies the (prompt payment) payment
agreed between Saudi Enaya and healthcare providers, once Batch are processed within a particular
number of days Saudi Enaya Have the right in a discount.
System sends Automated Alert Mail to Finance
Finance Team process in system and makes transaction updates their records
Once Batch is processed and evaluated by Claims Dept. it’s posted at the System.
Finance department clears the payments of Approved Amounts for processed and posted claims
batches and updates the record.
Once claims batches are processed and posted by claims department, system will alert network team
to notify and send claims summary statements and report to providers.
Once claims summary statements and reports reviewed by provider and agrees to the approved
claims sends back the signoff statements to network team
Assigned Network Dept. Admin updates the status of relevant batches as closed at the settlement /
reconciliation-tracking sheet.
Assigned Network Dept. Admin send notification mail by attaching relevant signed off batch
statements to claims team for updating their records
10
Example of Claims Statement
In case provider does not agrees and resubmits the claims within acceptable period with proper
justifications from all aspects, claims team will re-evaluate the claims.
Claims department will send the re-evaluated reports to network team
Network admin team will send the re-evaluated summaries and reports to provider copying
concerned area network team for signoff the statements
If provider disagrees to percentage for re-evaluated claims, concerned area provider network team
has to review the reports and to communicate with provider and pursue to signoff the statements.
If provider still declines, then to schedule meeting preferably for claim-by-claim basis or commercial
settlement is done by meeting and upon agreement full & final letter will be sent to provider
Concerned area Network Manager / Supervisor must review the rejected claims report; observe for
major rejections and any abnormal claims behavior.( Fraud Unit )
Any fraudulent or suspicious behavior is noted, dig deeper and cross check the physical claims
Thoroughly and keep it handy for reference, postpone the meeting
All the observed trend and behavior is to be clarified at meeting with provider and pursue to avoid the
same at future claims.
Once the meeting / negotiations done report the details of conclusions and seek approval from
Network Manager for percentage.
11
Once final SF percentage is agreed, take official confirmation from provider and forward the request to
admin team for preparation of full and final settlement letter.
Concerned area Network Manager / Supervisor are required to follow up with providers to obtain the
signed letters and forward to admin team
Example of Sign reconciliation Letter
12
Saudi Enanya Departments
Sales: Sales Department focus on SME (Small and medium sized enterprises) and corporate through direct
sales in main cities of Jeddah and Riyadh, and manage kingdom wide with a team of telesales aiming on those
clients.
Sales Department deals also with Brokers who are licensed and contracted to manage all kind of clients.
Underwriting: issue the quotation and determine the insurance risk and who much premium the client will
pay, insure that healthcare plan are CCHI compliant, and insure long term financial stability.
Membership: handle policies creation old and new, uploading members into CCHI portal and editing member
details such as addition or dilation.
Customer Service: Received call through directed number from members and providers, immediate action
for members request, handling complaints, keeping members satisfied
Medical Approval: handle Authorization coming from providers for our members, refer members for second
opinion or in case the service wasn’t available, medical team has to ensure all decisions were taken within
approved Policy
Claims: insure of receiving, filling, evaluation medically and technically of all received climes
Provider Relation: create the healthcare network with quality services within affordable price. Establish
strong relation with providers to manage reconciliation and agreements.
Finance: handle all payment related to trade or providers, customer transactions, creating external report
and internal managerial report.
IT: IT departments consisting of four levels of restructure
Enterprise application
Electronic claims
Quotation Admin
Reports and analyses
E-Comm
E- Services
Policy Admin
13
Application Integration
Integration between web server and external system (SADAD,WASEEL,CCHI )
Integration between web server and interface table( SMS, E-Business)
Presentation Layer
Mobile APP
IVR –Self services
E-services
Provider Portal
Interaction Channel
Customer on the phone
At Branches
Online customers
Customers at Providers
TOSHFA (Integrated Insurance Solution)
•Toshfa is Saudi Enaya system that provides a complete integrated insurance solution to meet all the needs
of current insurance industry as per the regulation requirement of kingdom of Saudi Arabia.
14
Quality & Control:
Restructuring Saudi Enaya Quality System based on current process flow
Reengineering the current process flow
Amend the process based on the reengineered business process
Continues improvement and review in order to maintain enhancement.
Saudi Enaya has developed a quality management System (QMS) which has been completed around 75% of
its progress, it include operation procedures, work instruction and the major standard policies.
All documentation which was approved is available in quality folder, and to have an access to this folder you
need to have an approval from quality department.
The quality folder is subject to internal quality audit in order to check if departments are complying with the
approved procedures.
Internal Audit will conducted through trained auditors under the supervision of quality department
The plan will be shared with all departments beginning of each year.
Quality Activities within provider network Department
In regards to quality assurance in the internship departments we had to be sure of several steps in order to
be sure of the correct process.
Reconciliation
Check the updated data from claims tracking sheet
Calculate the shortfall percentage and reevaluate the rejection notes
Evaluate the extracted reports such as ( unit cost, average per visit, claimed amount,,,atc)
Example of analysis
15
New contract (healthcare provider)
Check validity of documentation ( CR, CCHI Certificate, MOH)
Price comparison to be sure the agreed provider network
Check region and area of provider
Check the structure of population in the provider area
Check availability of major specialties such as dental,OBGyna, internal medicine & surgery
Fraud & abuse detection
Check received information about the case and validate presented scenarios
Identify the involved parties
Agree on the method of documentation in order to identify fraud activities
Validate findings by checking extracted reports
16
Comparison Theory
As I have studied for the last four years business administration while I was working I found out that not even
50% of what have I studied are been applied inside local or national organization, accept for multinational
organization, as they are more focused to change and globalization. They have continues thrift for change as
they know that’s it’s the trend.
For national organization they have a traditional standard, military way of distributing task, how the power
flow from up to down, which make it difficult for employees to express their concern about an assign task,
they have to follow the chain of command. I found it difficult to express my concern in my department and
had to go with what my management wants even though my job is more exposed to more than sitting in an
office and checking emails.
There was no chance of career path in Saudi Enaya or any type of incentives that can be added as a value for
the employee work, which keep the turnover rate not stable, as I have studied that there are type of rewords
can be giving to the employees for their work that keeps them satisfied. Even if they feel good about their
work they don’t get the appropriate appreciation.
Being employees for more than 11 years made me realize the type of organization that care about the
employee and create a training schedule that are suitable for each to enhance their knowledge, once the
organization worked on those they can be sure that her employees will be a life partner and will never leave,
as he will be loyal to that organization.
Going back to the type of local organization I am working in right now I was faced with the issue of not
following the rules of cooperative health insurance in regards to family insurance, I am a single mom and
supporting my daughter and as per the rule I should have insurance for her, and I had to submit the prove
that …
For Instructor’s Use only
| Course Name: Internship | Student’s Name:Abdulaziz Saad alghamdi |
| Course Code: MGT430 | Student’s ID Number: 140022344 |
| Semester: First term 2021-2022 | CRN:14025 |
| Academic Year: 144 /144 H |
| Instructor’s Name: | |
| Students’ Grade: | Level of Marks: |
Assessment and Observation of the Internship program
outline
Internship Activities, Tasks and Responsibilities
Introduction of the training organization
An Overview of the Internship program
Conclusion
The provision of a valuable opportunity to experience the essentials of daily business administration by working toward specific activities and tasks
The ultimate outcomes of the enrollment in the Internship program is to assess the credibility of acquired academic skills and knowledge of the senior students for engaging in real working environment.
An Overview of the Internship program’s outcomes
The engagement in a direct supervised orientations towards assigned functions and responsibilities for the fulfillment of the organization goals and expectations.
The development of an awareness accountability and responsibility regarding the organizational behaviors into critical thinking skills and problem-solving abilities
The training organization is Saudi Aramco, DH industrial security operation department, Admin unit.
Tracking, assessing, and responding towards the overall performance and KPI outcomes of the department in compliance with the corporate HR policies and rules , IT Usage Behavior, and internal work rules.
Introduction of the training organization
The purpose and scope of the division is corresponding of safety and security services concerns and conflicts to SADH area facilities as well as administrating, coordinating and directing the operational activities in compliance with the corporate, department and government directives.
The proponent of the department technical enhancements and development, participating with ISED for coordinating and facilitating of the installation and maintenance of security equipment and assets, hosting corporate announcements and campaign
related to security and safety publications.
DHISOD
Admin unit
Operations units
Internship Activities, Tasks and Responsibilities
Over the past three months, I participated in several administrative duties, roles and responsibilities including the following:
Conducting root cause, and statistical analysis to break down practical issue and prioritize massive amount of personal meeting requests with the division head, SAP workflow job-related processes, and inbox email responses.
Gaining limited system access for performing specific tasks and duties such as reviewing and evaluating the validity SAP role requests of the operational personnel as well as processing and dispatching workflow items on CRM.
Supporting in functional HR processes include nominating eligible operational personnel in term of specific managerial criteria (history of APA category, current position, and proficiencies of mastering assigned duties) for INKK an OKK professional courses in collaboration with the ISODU.
– Assistance of the unit digital awareness campaign team in creating and announcing of several job-related requirements such as COVID-19 Vaccination progress, higher level managerial directions, and safety messages and vouchers.
CONT. Internship Activities, Tasks and Responsibilities
Planning and scheduling B2B requests with particular vendors for the maintains and
replacement of security equipment of posts,gates and patrol vehicles as well as placing purchasing orders
to fuel the department stationaries and refreshments needs, Operational personnel uniforms and accessories.
– Assistance of the unite quality assurance and compliance review team in creating monthly awareness survey, reviewing and evaluating systematic innovation and enhancement idea through corporate platform.
Collaboration and arranging with other corporate departments in assisting and facilitating their activates
and events such as Community services department, corporate affairs department, and personnel department .
CONT. Internship Activities, Tasks and Responsibilities
The department actively comply with the corporate stablished and standardized values and principles in accordance of integrating the overall key business objectives.
The department vision, mission, and ultimate objectives are measured by the following principles:
Assessment and Observation of the Internship program
-.
A wide range of academic administration principles, approaches, and techniques were actively practiced including:
1
4
2
3
5
6
Communications skills
Organizational
skills
An aye of detail
skills
Problem-solving
skills
Technology
skills
Critical thinking
skills
Finally, I would express the past three months in a context of “professional career journey” whether from working with my kind and collaborative Dr. Faisal Alhathal or my field supervisors over the time whom were supportive and patient with my curiosity and enthusiasm
Conclusion of the Internship program experience
.
The obtained knowledge during my internship program are explicitly interpreting the context of my academic study as a senior student in the filed of administrative science.
The opportunity in engaging in real-job environment was fully loaded with interest and enthusiasm in which lead me in exposing my skills, knowledge, passion and adequate capabilities towards assigned duties and pro-active initiatives.
Thank You
Internship starts
January 6, 2019
Ends: March 21, 2019
Working hours per week 40 hours
SABIC terminal services company
SABTANK
College of Administration and Finance Sciences
MGT-430: Internship 22806
ABDULLAH ALI AON ALABDALI S150115570
Under supervision
Turki Al-Quraini (SABTANK)
Abdulaziz Al-Khurayadili (SEU)
1
Executive summary
This report is based on my internship at SABIC terminal services company (SABTANK) for the bachelor’s
degree in Saudi Electronic University at College of Administrative and Financial Sciences for the year 2019.
For the last three months (January 6,2019 / March 23, 2019) I’ve been delightful to work with chemical
business planning and logistic within SABTANK with great team who helped me to concur such amazing
internship journey. Every hour spent in completing task has given me more experience that sometime cannot
be translated into words, nevertheless it really shaped my classroom courses and helped me deploy what I
have learned to work life with success Alhamdulillah.
The report includes SABTANK history of its starts and the transformational phase from small storage
petrochemical company, to the leader of exporting/importing petrochemicals to help Saudi Arabia achieving
its economic development towards Mohammed Bin Salman vision 2030.
Joined Business planning function late 2018, and it was a great chance to explore such department within
my internship with the college guidelines which helped me to see what is really matter in work life to
concentrate on, to be better worker in the future with the help of my organization supervisor, college
supervisor and the classroom courses.
For the first 5 weeks of the program, I’ve worked along with full support of the department manager,
exploring department key performance indicators and see the best ways to configure them to numbers and
data, looking for ways to put more enhancement and improvement for both employees and work. And the
last 5 weeks worked with department supervisor of planning and logistic, planners and shift planners and
how the objectives given by the manager translated into great performance in a way of achieving
organization overall goals.
Under manager wing, I have mainly assisted translating employee performance and insuring department
KPI’s are achieved in weekly basis and provide necessary data are given in time and installed updated
employee’s performance chart,
“There are always a room for improvements” this expression is what I always here from department
manager which give the encouragement and involvement to think of ways to improve the work life and
enhance it continuously, and the table is big enough for everyone to share his ideas and thoughts.
Under department planning supervisor and the rest of the team, I’ve learned how to engage with various
tasks and techniques for serving other functions within the organization and serving stakeholders timely,
accurately and most important of them all, learning how to be responsible and accountable for the tasks
given to employees.
2
In this report I also include the major task I held during the internship program with full details and
highlighted the other daily/weekly repetitive tasks supported by pictures, sheets and charts as possible and
insure to make understandable enough for the non-industrial reader.
Through my internship program, I have learned in depth understanding of SABIC’s four value dimensions
Engaging Inspiring Creating Delivering
3
Table of content
Executive summary …………………………………………………………………………………………………………………………….. 1
Introduction ……………………………………………………………………………………………………………………………………….. 4
SABIC Terminal Services Limited Company …………………………………………………………………………………. 4
Our Vision ………………………………………………………………………………………………………………………………………. 4
Our Mission…………………………………………………………………………………………………………………………………….. 4
Our Values ……………………………………………………………………………………………………………………………………… 4
Address …………………………………………………………………………………………………………………………………………… 7
Internship activities…………………………………………………………………………………………………………………………….. 8
Conditions and functions ………………………………………………………………………………………………………………… 8
Organization Chart …………………………………………………………………………………………………………………………. 9
Business planning and chemical logistic Department chart …………………………………………………………… 10
………………………………………………………………………………………………………………………………………………………. 10
Services Process chart …………………………………………………………………………………………………………………… 10
Asset reliabilities analysis ……………………………………………………………………………………………………………… 10
Employee performance …………………………………………………………………………………………………………………. 12
External analysis …………………………………………………………………………………………………………………………… 13
Communications software and tools …………………………………………………………………………………………………. 14
SEABERTH ………………………………………………………………………………………………………………………………….. 14
Skype for business meeting ……………………………………………………………………………………………………………. 15
Microsoft Outlook …………………………………………………………………………………………………………………………. 16
Conclusion ………………………………………………………………………………………………………………………………………… 17
References …………………………………………………………………………………………………………………………………………. 18
4
Introduction
SABIC Terminal Services Limited Company
SABTANK is One of SABIC substantial companies established in 1996, a joint venture with VOPAK
international VP. Unrivaled facility on the fields of chemical petrochemical storage product transfer and ship
handling and asset management for port facility, Service Company dedicated to providing high quality bulk
handling, terminal, and material management services for SABIC and non-SABIC affiliates. SABTANK
operates two port facilities: one in Jubail (KFIP-J) and one in Yanbu (KFIP-Y).
SABTANK has two port terminal operation facilities under its fold. One is KFIP-Jubail, consisting
petrochemicals quay-1 (PCQ-1) of eight berths serviced by ninety- nine storage tanks, storing Forty-four
different chemicals, petrochemicals quay-2 (PCQ-2) consisting of five berths serviced by seventy- eight
storage tanks, storing Forty-one different chemicals manufactured by SABIC and non-SABIC affiliates.
SABTANK also operates two solid handling terminals. One is the Urea Handling and storage terminal where
Urea is stored and loaded through four berths in bulk. The other is the Iron Ore unloading facili ty which has
two berths where the Ore is unloaded from ships and directly transferr ed to steel plant through conveyor belt
facilities in Jubail Industrial City.
The other is KFIP-Yanbu where two berths are supplied with twenty products out of which three are stored in
twelve storage tanks located at the port. In total, SABTANK handles 105 different chemicals produced by
SABIC and non-SABIC affiliates. SABTANK has a cumulative storage capacity of more than one million
cubic meters and the berth throughput reaches around thirty-two million metric tons per annum, extension to
manufacture sites for the interface in their supply chain.
Our mission to reliable, proactive and dynamic leaders in operation and maintenance.
Our Vision
To be the preferred logistic service provider in port operations.
Our Mission
To be a pro-active, dynamic leader in operation and maintenance & Reliability of port facilities storage, product
handling and related logistical services that adds value and provides high quality services in a safe, secure,
healthy and environmentally- friendly manner to exceed stake holder’s expectations.
Our Values
• Customer Satisfaction.
• Quality Service.
• Credibility and Transparency.
• Trust and Mutual Respect.
• Inspire and engage employees.
5
Port facilities storage product handling and related logistics services that add value and provide high quality
service in a safe secure healthy and environmentally friendly manner to exceed stakeholder expectation.
We extend a unique, innovated services and work around the clock serving more than 27 of SABIC affiliates
and private companies.
SABTANK specialized in seaport storage and handling of liquid, solid and liquefied gases.
More than 36 MMT of petrochemicals per year are shipped by 1350 vessels (Vessel Draught 16 meter) to
KIFP of both Jubail and Yanbu. 1.75 MMT liquid capacity and 110 KMT warehouses using sophisticated
transfer methods like pipelines trucks and rail routes.
Known as the leading treading hub for liquid petrochemicals, SABTANK applies best in class technology for
various storage, loading unloading activities using 21 berth and more than 180 tanks handling more than 90
products.
Most of these tanks are connect to manufacturing sites through extensive pipelines networks, thus enabling
reliable and constant product movement between port and plant.
The storage tanks are equipped with automatic tank gauging system that measure accurately the quantity of
products.
6
SABTANK managing hyperactive stations, which facilitate to handled rail wagon as well as over 150 trucks
per day for loading and unloading activities.
Iron ore, the metal of universal use and the backbone of modern civilization, off loads here in SABTANK
through the state of art “conveyer belts”, spanning than 30 kilometers.
Urea manufactured by SABIC affiliate is exported as baulk shipment at the solid product terminal at rate of
600 ton/hr. through four jetties and five receiving stations accommodating of an average of 600 trucks per day.
SABTANK is the heart of SABIC and other private companies supply chain, handling chemicals, meatal and
fertilizers. It can limit or accelerate time to market speed, extend it service in capitalize on its relationship with
related authorities within the port areas. Elevated complexity in terminal due to the handling of specialty
products and different shipment compensation is easily roll over by SABTANK.
With every new product introduced SABTANK continue to expand it knowledge portfolio and experience.
Qualified tech and engineers preform maintenance and technical operation for terminal facility in planned and
systematic way, ensure availability of these assets, eventually leads to increase productivities and customer
satisfaction.
7
SABTANK is committed to support customer’s growth by efficiently managing their project at king
Fahad industrial port in Jubail and Yanbu.
Our commitment is safety at SABTANK is second to none. SABTANK integrated management system
SIMS emphasizes on providing quality services without ever compromising the safety, health, security
and environment standards. SABTANK is been publicly recognized with honorary such as Responsible
care certification 14001, ISO 9001, OSHAS 18001, ISO 55001 and many more.
We are committing to serve our customers better, thus conforming SABIC 2025 strategy.
We are: Sophisticated Accessible Beneficial Transparent Advanced Noteworthy Kinetic.
Address
SABTANK (Al Jubail)
P.O. Box 10135
31961 Jubail Industrial City
Kingdom of Saudi Arabia
Tel +966 13 345 3737
8
Internship activities
Conditions and functions
During the internship, Mr. Turki Al-Quraini has supervised me along with all department planning
supervisor and Logistics planners.
I worked as Analyst for Business planning department with the following main work criteria:
• Ensure all logistics system (Users, Supply Chain, SABTANK, Agent and Surveyor) functionality is
aligned to optimize the shipping performance.
• Define and report metrics to track, analyze, improve and control the Berth utilization and
availability.
• Incorporate SABTANK capabilities with the Users commitments to derive the Excellency.
• Collaborate with various departments internally and ensure that any system Shutdown is executed
timely and efficiently.
• Enhance the departmental communication and reporting structure
Stockholder Expectation Key topics
Customers Top management ensures
that customer requirements
are understood and met, by
requiring compliance with
the documented procedure
for Customer Related
Processes
Strives to identify current
and future customer needs to
meet customer requirements
and exceed customer
expectations.
Business partner The center of SABTANK
Vision and Mission.
SABTANK considers the
needs of its stakeholders to
deliver outcomes that strike
a balance between price and
delivered quality of service
SABTANK strives to
engage with stakeholders in
a transparent manner to
create an atmosphere of
mutual trust and confidence.
9
Organization Chart
10
Business planning and chemical logistic Department chart
Services Process chart
A notification sent from (Users, SBU, ship agent) to SBATNK logistics about the services required,
loading/unloading chemical product containing all ship information such estimation time of arrival,
quantities to be loaded or offloaded, ship communication system and ship tank history (quality point of
view) …
This information to be registered within SEABERTH system to be reflected to all system end users by
logistic planner. Later, to distribute and communicate the information’s to both port authorities and shift
planner with respect to their function, the right information will be delivered timely and updated.
Once the ship called by port authorities and been berthed and served under SABTANK, an on -spot updating
will be provided by both shift planner and logistic planner till the end of ship activit ies so that the USERS
can easily get the information he need when needed.
Asset reliabilities analysis
One of the major analysis I has carried out during the internship was for SABTANK berths annual
maintenance performance and sudden shutdowns.
Here in SABTANK berths are the hearts of it, so any interruption in berth facilities will not only affect
SABTANK KPI’s, it will be as “butterfly affect” for all stockholders, users: SABIC and non SABIC, ship
owners and customers all over the world. That’s why every planned or unplanned shutdown will be under
focus by everyone.
Generally, central maintenance department developed a maintenance plan and duration to execute this plan
for all berth as a yearly plan, we as business planning department review this plan on base of time
(maintenance duration and when the best time to preform it). Our role is to challenge and reduce, delay or
even reject the proposed plan base on giving facts.
This fact is an analysis that I was responsible for during my internship, is to record all previous annual
maintenance and review all work has been carried out during it.
The analysis is put also to monitor berths day by day reliability and measures the frequent breaks down, and
help us to interfere to help these berths continuity serving:
• Which berth has been low operation performance related to maintenance issues?
• How much time did we lost for maintenance issues outside annual plan?
• Do we have repeated issues that have been reported after maintenance plan?
• Issues accountabilities.
Sr. Manager
Business
planning&Logistics
ADMIN Assistance Business engineer Analyst TMS Admin
Manager solid
logistic
Analyst port&agent
Planner
Transportation&
Inventory
Supervisor
Planning&schadulin
g
Planner (Logisticsx4)
Manager Chemical
Logistic
Logistic Engineer
Analyst planning
&Schedualing
Supervisor shipping
Planner (shiftx8)
Supervisor
Planning&
Schaduling
Planner (Logisticsx4)
11
This analysis helps us to point out berths need to be taken for immediate maintenance, count total time of
this outage that and hold responsible/accountable related department in front of top management to insure
business continuity.
Six lean sigma (DMAIC), one of the most power concepts that we learned in text book during collage
journey and we had the opportunity to apply in this analysis to improve and sustain berth operational
activities from asset point of view.
Technical team and logistic department have set together to DEFINE frequent problems and their affects for
organization KPI’s and put them under our radar. Since the time is the major threats, we MEASURE and
quantify the waste occurred during berth idle for maintenance and we found most of it spare parts
unavailability, with the help of the ANALYSIS that we based our challenge on, we could point out the
frequent asset break down and time wasting in waiting for maintenance readiness, and then
IMPROVEMENT has shown for berths after been retune to normal operation with sustain efficiency, and
continue CONTROLLING for such behavior and knowledge towards improvement.
12
BERTH
NO.
2018 2019
REMARKS
PLAN ACTUAL PLAN ACTUAL
B36 May 06 – 10 May 12 – 16 April 21 – 25
B37
April 29 – May
03
May 27 – 31 January 27 – 31 January 27 – 31 Revised
B41 April 22 – 26 April 30 – May 04 March 12 – 16 ON GOING
B42 May 13 – 15 April 01 – 05 March 24 – 25 As planned
B43
September 24
– 28
September 24 – 28
February 24 –
28
February 24 – 28
B44
November 25 –
28
November 28 –
Dec. o2
November 24 –
28
B52
October 21 –
25
October 22 – 26
September 15 –
19
Revised
B53
October 07 –
11
October 08 – 12
October 06 –
10
Employee performance
When I joined the team, there was one weekly monitoring sheet for department employees who are pointed
as on-call planner, this sheet inputs were related to department KPI’s such as waiting time for ships at
anchorage, number of ships served over the week, ships idle time, ships operational time, net
loading/unloading flow rate, ship file closing accuracy… and so on.
I’ve managed with my supervisor to transform these numbers to evaluation measures for my team workers
and communicate, discuss the /achievement/discrepancy of this performance at weekly basis over an open
brain storming discussion every Sunday, jointly with all co-worker to share the on-call planner obstacles and
solution he brought to overcome such obstacles.
This discussion has helped improving the competency between team members to achieve high number of
performances during the week which reflect the performance over month performance and hopefully the
whole year.
13
Planners
Sum of
Ship Files
completed
Sum of
Error
Ship
Files
Average of
Ship Files
Accuracy
(%)
Average of
Waiting
Time at
Anchorage
Average of
Non-
Loading
Time
Average of
Net
Pumping
Rate
Ansari 15 3 80% 8:31:20 9:35:20 647.33
Battah 9 3 67% 6:50:40 10:05:20 763.00
Hatim 14 3 78% 5:44:40 8:15:20 578.67
Naif 12 3 75% 8:44:20 11:19:00 722.33
Rizwan 12 3 75% 7:55:20 8:08:20 752.67
Sunaitan 17 3 82% 3:24:20 11:05:00 471.67
Grand
Total 79 18 76% 6:51:47 AM 9:44:43 655.94444
External analysis
For the last couple of weeks, we got notify that one of SABIC entity (IBN SINA plant) leader manufacture
in producing Methyl tert-butyl ether (MTBE) and Methanol (MEOH) is going for unplanned shutdown,
IBN SINA plant is considered as down-stream for three other plants in regard to MEOH suppling.
Partnering with ARRAZI plant to compensate the production, and the SharePoint of this compensatory
between IBN SINA and ARRAZI is SABTANK.
The unplanned shutdown is threating ARRAZI inventories at SABTANK due to enormous quantities that
IBN SINA has requested with them in order to continue supplying down users without interruption and the
same time is threating SABTANK KPI of serving shipment timely due to the loss of product availability to
this plan.
As SABTANK planning department, we requested a high urgent meeting with affected parties, ARRAZI
business planning and production units. IBN SINA business planning. And SABIC business units and
marketing. To forecast the shutdown duration, weekly demand quantities along with customers demand over
the world and developed one analysis for these requirements.
This concern then has been taken internally with SABTANK technical team to find solutions and wa ys for
overcoming this major interruption to revenues and SABIC image to its customers with rerouting product
receiving to SABTANK tanks to build and hold inventories at port side at the same time fulfilling IBN
SINA demand quantities.
Sum of Ship Files
completed
Ansari
Battah
Hatim
Naif
Rizwan
Sunaitan
0%
20%
40%
60%
80%
100%
Ansari Battah Hatim Naif Rizwan Sunaitan
Average of Ship Files Accuracy (%)
14
• Transfer rate to IBN SINA has increased from normal transfer rate by 20% without jeopardizing
SABTANK integrity. (250 mt/hr-300 mt/hr)
• Shipments scheduling changed for the forecasted bottle neck of production, only for the arrival
times of shipments by 10%, especially for SABIC carries.
• SABTANK operation to maintain SABTANK inventories at certain levels (50% of all MEOH
old tanks and 80% of new tank) and notify us in advance for any level dropping for further
arrangements.
Communications software and tools
SEABERTH
In April 2011, SABTANK has chosen Cirrus’ SEABERTH to enhance terminal scheduling, management.
SABIC Terminal Services Co (SABTANK), decide to change the old system “TPS (terminal paper
flow system” of handling and scheduling transportation.
SEABERTH integrated system, has added efficiency to berth operation activities which is compatible with
such growing terminal.
SEABERTH philosophy is using Terminal operational business Key Performance Indicators (KPI) as
drivers for initiating an algorithm to schedule the right time, ship and berth to accommodate loading or
unloading activities. The system has enhanced decision-making and analyzing ships situation, for logistics
planner to perform scheduling activities planning and
optimizing ship and berth operation activities and to reduce cost of these operation later for both customers
and SABTANK.
SEABERTH has been integrated in all SABTANK sectors (liquid petrochemicals, Solid and Iron ore) in
both Jubail and Yanbu, which gives visible integration of the management system and allow the desired
analysis to be at hand when requested by stakeholder or SABTANK executives.
15
One of SEABERTH influences on both SABTANK and end customers is improving CS levels at the same
time as reducing waiting time, demurrage costs and increasing terminal throughput. On the other hand, the
system has standardized and molded the operation activities to insure berth optimization.
What distinguish SEABERTH from the previous system, that measures continuously, accurately and on
early basis the business KPI’s, to indicate the gaps and the pitfalls and inefficiencies once they happen to
insure rigid follow up from all SABTANK functions to adjust and correct what’s need to be corrected.
Assuring walking on the right track toward terminal operation succession and customers satisfaction.
The system also gives an opportunity to simulate solutions for planners to try several cases in front of
implementing them in real operation activities and planning to estimate pitfalls, cost and improvement if
any.
SEABERTH’s comprehensive multi-user environment also helps the logistics planning department move a
long way towards a paperless environment, whilst expediting the communication of business-critical
information up and down the supply chain.
What makes the system powerful and easy to install in any organization that mainly regarded to
transportation activities (marine transportation) to the previous one, the training material was been delivered
to employees in just weeks and from then the old system was terminated.
Skype for business meeting
A powerful communication tool has shortened
distance between us and stakeholder and made
meeting more efficient in matter of time.
In the past we had only two choices for meetings,
either to held it face to face which is difficult to
find the right time for all parties concern
especially for those outside Jubail, or by phone
conferencing meeting which contain lots of
barriers and the absences of material presented for
everyone makes it hard to follow up with topic or
issue under addressing.
With tool, no limit for invited people, all
materials from everyone can be presented and all
aspect is been fulfilling for each meeting
members.
16
Microsoft Outlook
The heart of organization communication and 95% of it gone through. Very powerful for exchanging
organization folder, organizing companies SharePoint list and helping scheduling meetings internally and
externally
During the internship and following the supervision of Mr. Turki I have gained more skills in deliveri ng data
to top management and stakeholder as well. Timing, data selectivity/quality.
I’ve gained the skills to manage time through several tasks, skills of delegate some task that required other
functions inputs, prioritizing tasks relatively.
I’ve gained the skill how to deal with different type of employee’s personality. Thinkers, independents,
perceiver, extravert and the way of motivating such kind of different personality, in the roll of being
delegated as manager during in my internship.
During in my internship as mention above, I’ve been delegated as manager responsibilities in the absence of
Mr. Turki beside of the responsibilities of planning supervisor, in this delegation I was put in the spot of
transformation from being follower to a leader of looking of organization improvement along employee’s
improvement and enhance the task that given to us. The internship changes my prospective towards
organization, made me to see the big picture of how all functions within are working together in integrated
system. How one function has an impact on another and the right way of dealing and delivering this
integration towards organization success.
The internship took me from the chair of doing tasks, to the operation room of developing these tasks to
achieve organization vision and missions
17
Conclusion
Overall, the internship added an experience and new skills to what I have already. I gained from the positive
well instructed guideline of the internship program helped structured this report in the way it app eared as it
is now. I’ve have seen the similarity in facts and theories between classroom and real -life work. For the first
2 weeks I discovered some challenges in transforming the daily activities to academic format. It was a great
opportunity discovering what my strength and weakness are, gave me new insight of how to improve both in
coming future.
The internship program gives the accessibility to engage with most of organization …
Post Order # DHFG0046 Post No: 1571 Execution Area: 32
Department:
DAISOD
DIVISION:
DIASOD
Issue Date
06/20/2020
Type of the Post Location Fixed Gate Vehicle Patrol Air Marshal Sea Marshal
Restricted Non Restricted Community
Armed Post Not Armed
Computerized Non Computerized
Industrial Non-Industrial Community
Post Name: North Admin Gate
Post Code: N/A
Access Code:
NONE
Approval
YAS
Page
1
Coverage Days: Sun – Sat Coverage Hours: 24/7
Post Service: Temporary Sticker Visitor MGPS Other—————————
Emergency Alternative post:
EXPEC 2 Gate
Saudi Aramco: Confidential
MISSION
To maintain protection of the company’s assets and employees, and the security of operational facilities, in a highly
efficient, transparent, and cost effective manner, using the most appropriate workforce and technology, in compliance with
Government Directives.
SCOPE
1. To monitor and control vehicle, pedestrian / materials entry to and departure from the facilities.
2. To receive information from employees, members of the public and government to take appropriate action(s) as
mandated by the operating procedures.
3. Require limited supervision for doing assigned tasks.
PURPOSE
To protect Saudi Aramco personnel, assets, and property as directed by Saudi Aramco Industrial Security Management
and the Saudi Arabian Government.
BASIC FUNCTION
Performs in field operation, functions of assigned area and/or the monitoring and controlling of a gate/post. Maintain the
confidentiality of the job and do not release job related information.
MAIN DUTIES OF SECURITY PERSONNEL
PRINCIPAL DUTIES
1. Report to duty on time wearing the proper and complete security uniform. Remain at your assigned post until
physically relieved.
2. Check Threat Level Matrix and apply the existing threat level procedures when you start duty.
3. Inspect all equipment’s and items at the post and report any discrepancies to your supervisor immediately using
inspection form.
4. Check the weapon and its accessories if assigned and officially receive it as directed in the weapon instructions.
5. Take over the complete security operations from the outgoing shift.
6. Request all employees / contractors employees to display their IDs at all times.
7. Report any unusual situations (incident /emergency/suspected items) to the supervisor or DH 911 Emergency Center
immediately. Request K-9 search if required.
8. Report any failure of (SSMD) Security System Maintenance to the supervisor and DH 911 EMERGENCY CENTER.
9. Monitor all surveillance cameras through the screen of your post and investigate any observation.
10. Report any lost/found of Saudi Aramco ID card (All types) to your supervisor for handling. Supervisor must notify DH
911 EMERGENCY CENTER.
Post Order # DHFG0046 Post No: 1571 Execution Area: 32
Department:
DAISOD
DIVISION:
DIASOD
Issue Date
06/20/2020
Type of the Post Location Fixed Gate Vehicle Patrol Air Marshal Sea Marshal
Restricted Non Restricted Community
Armed Post Not Armed
Computerized Non Computerized
Industrial Non-Industrial Community
Post Name: North Admin Gate
Post Code: N/A
Access Code:
NONE
Approval
YAS
Page
2
Coverage Days: Sun – Sat Coverage Hours: 24/7
Post Service: Temporary Sticker Visitor MGPS Other—————————
Emergency Alternative post:
EXPEC 2 Gate
Saudi Aramco: Confidential
11. Report any misuse of Saudi Aramco ID card (All types) to your supervisor for handling. Supervisor must notify DH 911
EMERGENCY CENTER.
12. Confiscate expired ID cards and hand them over to your supervisor for handling. Supervisor must send the ID card to
Security Shift Supervisor Office for farther handling.
13. Perform any other duties as and when assigned.
14. Participate in all emergency drills and training sessions as required within the facility.
15. Show respect to public at all times and treat people courteously and politely.
16. Do not use mobile phone during work performance or while dealing with public.
17. Maintain good housekeeping in and around your post and report any discrepancies to the immediate supervisor.
18. Monitor and protect all communication equipment at all times.
19. Do not allow photography unless permitted.
In case of emergency at the facility:
Facilitate the access of the emergency response crew.
Register the actual number of person in each vehicle.
Record the door number of each vehicle.
Redirect all trucks entering the affected facility to nearest staging position to free the road for emergency vehicles.
Make sure that all registered rescue teams left the facility when the emergency is over.
PRINCIPAL ENTRY DUTIES
1. Make sure all Saudi Aramco employees and contractors have valid Saudi Aramco facility designated ID Cards.
2. Log in the information of all accessing persons in the system or manually in the log sheet if the system is down and
send the log sheet to Security Shift Supervisor for farther handling. Security Shift Supervisor must send it to SACSMD.
3. Check the temporary access information and compare it with official documents (ID / Iqama / Passport).
4. Ensure that the sign in authorized person come personally to sign (gas cylinders, sand loads, sealed tankers/trucks,
and flammable material) at all times.
5. Deny the access of Persona Non Grata and report it to the immediate supervisor. Supervisor must notify DH 911
EMERGENCY CENTER.
6. Deny the access of private vehicles to the facility at all times.
7. Deny access of vehicles without license plates to the facility at all times.
8. Deny the access of all vehicles that do not meet the minimum safety requirements (fuel leak, smoking exhaust pipe,
broken windshield, defective tires, improperly loaded vehicles, noisy sound etc.).
9. Deny the access of vehicles with dents unless they have a police clearance.
10. Deny and stop vehicles or/and persons carrying any type of weapons whether licensed or not and notify your
Supervisor immediately. Supervisor must immediately notify DH 911 EMERGENCY CENTER and handle the case.
11. Deny the access of Government personnel wearing official uniform unless permitted by Corporate Affairs Dept.
12. Deny the access of personal visitors to the facility at all times.
13. Request K-9 search team to search all containers and big material if they can’t be manually searched.
Post Order # DHFG0046 Post No: 1571 Execution Area: 32
Department:
DAISOD
DIVISION:
DIASOD
Issue Date
06/20/2020
Type of the Post Location Fixed Gate Vehicle Patrol Air Marshal Sea Marshal
Restricted Non Restricted Community
Armed Post Not Armed
Computerized Non Computerized
Industrial Non-Industrial Community
Post Name: North Admin Gate
Post Code: N/A
Access Code:
NONE
Approval
YAS
Page
3
Coverage Days: Sun – Sat Coverage Hours: 24/7
Post Service: Temporary Sticker Visitor MGPS Other—————————
Emergency Alternative post:
EXPEC 2 Gate
Saudi Aramco: Confidential
14. Check and verify all ambulances approaching the post to make sure they are not being misused.
15. Utilize the X-ray machine for scanning all material entering to the facility (isolated subspecies material & person) any
found suspect items such as (weapons, explosive martial or liquid) to DH 911 EMERGENCY CENTER .
PRINCIPAL EXIT DUTIES:
1. Log out all exiting vehicles and persons in the system/manually when the system is down at all times.
2. Don’t allow the exit of company materials or personal items without a gate pass.
3. Deny the exit of vehicles with dents unless they have a police clearance otherwise, stop the vehicle and take the driver
and vehicle details and notify DH 911 EMERGENCY CENTER immediately.
4. Inspect all of the exiting hand carried items.
VISITORS AND TEMPORARY ACCESS
1. Check the temporary access information and compare it with official documents (ID / Iqama / Passport).
2. Log in all visitors against their host.
3. Visitors are allowed only during visiting times.
4. Always keep the executive management visitors’ file updated.
HANDLE MATERIAL GATE PASS AS DIRECTED BELOW:
Check and verify the information of the regular, multiple, emergency, and personal gate pass at the post.
The approved gate pass will be utilized and the materials are to be taken out of the gate or post within a week’s
time (1-7 days).(refer to GI#710.009 section 6.0)
Compare the materials description and quantity in the gate pass with the actual material.
Report the excess of material during the verification of gate pass to the immediate supervisor.
Execute gate passes after verification of the actual material and information immediately.
Inform the immediate supervisor if the execution can’t be done for any reasons.
INCASE OF HEARING EXPLOSION OR FIRE ARM SHOOTING
1. Secure your post carefully.
2. Wear the protective gear (vest and helmet).
3. Load and arm weapons and take observation and engagement position.
4. Notify DH 911 EMERGENCY CENTER immediately.
5. Direct others employees, contractors and visitors at your area to safe distance and direction.
HANDLING WEAPON AND AMMUNITION
1. Read and implement all the instructions in the weapons file and SEIAS when assigned.
Post Order # DHFG0046 Post No: 1571 Execution Area: 32
Department:
DAISOD
DIVISION:
DIASOD
Issue Date
06/20/2020
Type of the Post Location Fixed Gate Vehicle Patrol Air Marshal Sea Marshal
Restricted Non Restricted Community
Armed Post Not Armed
Computerized Non Computerized
Industrial Non-Industrial Community
Post Name: North Admin Gate
Post Code: N/A
Access Code:
NONE
Approval
YAS
Page
4
Coverage Days: Sun – Sat Coverage Hours: 24/7
Post Service: Temporary Sticker Visitor MGPS Other—————————
Emergency Alternative post:
EXPEC 2 Gate
Saudi Aramco: Confidential
2. Armed security men who carry weapons are responsible for weapon, ammunition, and accessories accountability.
3. Check the authorization list before you hand over the weapon.
4. Armed security men are responsible to safely handling the weapon.
5. Perform daily and weekly cleaning to the assigned weapons according to WMP related procedure.
6. Report all weapons related incidents to your supervisor immediately.
7. Implement and review the use of force and Weapon Procedure Manual.
8. Do not leave your weapon unattended under any circumstances. The weapon will be carried all times during the shift.
9. If you find that your relief is not in good condition or acting with responsible behavior do not hand him the weapon and
report it to the Security Shift Supervisor.
SAFETY MEASURES
Read and implement the safety tasks as indicated in the Safety Management System (SMS).
Maintain Saudi Aramco Loss Prevention safety procedures.
Check your work location for hazards. Take any corrective action yourself if you are competent to do so without
further risk. If you cannot, then report the hazards immediately to your supervisor.
Keep your work area neat and clean.
Monitor energized electrical equipment.
Concentrate fully on the job you are doing.
Be visible to the drivers / pedestrians at all times and make eye contact with them.
Do not smoke in the gatehouse at all.
Be a good example for others.
SECURITY EQUIPMENT
1. K-9 team Special search team utilized to search vehicles, trucks, items, packages and etc.
2. Personal protective body armor (vest and helmet) to be utilized when the threat level matrix is orange, red or when
directed.
Post Order # DHFG0046 Post No: 1571 Execution Area: 32
Department:
DAISOD
DIVISION:
DIASOD
Issue Date
06/20/2020
Type of the Post Location Fixed Gate Vehicle Patrol Air Marshal Sea Marshal
Restricted Non Restricted Community
Armed Post Not Armed
Computerized Non Computerized
Industrial Non-Industrial Community
Post Name: North Admin Gate
Post Code: N/A
Access Code:
NONE
Approval
YAS
Page
5
Coverage Days: Sun – Sat Coverage Hours: 24/7
Post Service: Temporary Sticker Visitor MGPS Other—————————
Emergency Alternative post:
EXPEC 2 Gate
Saudi Aramco: Confidential
EMERGENCY CONTACT NUMBERS:
AMBULANCE: 911
FIRE: 911
SECURITY: 911
EMERGENCY CONTACT NUMBERS OUTSIDE OF SAUDI ARAMCO PHONE:
AMBULANCE: 8720911
FIRE: 8720911
SECURITY: 8720911
FROM MOBILE:
013 8720911
——————————–
DIASOD Superintendent
Yazeed A. Al Senani
Post Order # DHFG0046 Post No: 1571 Execution Area: 32
Department:
DAISOD
DIVISION:
DIASOD
Issue Date
06/20/2020
Type of the Post Location Fixed Gate Vehicle Patrol Air Marshal Sea Marshal
Restricted Non Restricted Community
Armed Post Not Armed
Computerized Non Computerized
Industrial Non-Industrial Community
Post Name: North Admin Gate
Post Code: N/A
Access Code:
NONE
Approval
YAS
Page
6
Coverage Days: Sun – Sat Coverage Hours: 24/7
Post Service: Temporary Sticker Visitor MGPS Other—————————
Emergency Alternative post:
EXPEC 2 Gate
Saudi Aramco: Confidential
