Chat with us, powered by LiveChat Devry GSCM330 2019 MAY Week 5 Course Project Latest - STUDENT SOLUTION USA

GSCM330 Strategic Supply and Master Planning
Course Project
You will be divided into teams for this course project. Your team must describe MPS, MRP, Time Fences, and ERP, as well as explain how these concepts relate to one another. Your research will be prepared and presented in a PowerPoint file.
The team PowerPoint must include the following:
Audio narration
Speaker notes of at least 150 words in length entered to the speaker notes section of each content slide (all slides except the cover slide, agenda slide, and references slide).
The cover slide should include the first and last name of each student who was able to participate in and contribute to the development of the PowerPoint.
The team may designate a single student to complete the audio narration or the team may decide to have different students narrate different slides.
Additionally, as this is a team course project, you will be graded on individual contributions as well. Below is the rubric for team and individual grading.

error: Content is protected !!